Commercial & public sector

Thornton School, Birmingham
|
PROJECT DETAILS:
- Grid-tied solar photovoltaic (PV) system with Sharp modules fitted onto the flat (felt) roof of a new school.
- Photovoltaics installed to meet a requirement for all new schools in the area to have renewable technologies.
|
|
SYSTEM SIZE:
3.6 kWp (20 x 180W modules)
|
INSTALLATION DATE:
September 2009
|
|
TECHNICAL SPECIFICATION
|
PV Modules:
|
Sharp NU-180 (monocrystalline)
|
|
Mounting System:
|
Solion SunMounts
|
|
DC/AC Inverter:
|
KACO Powador 3501xi (x1)
|
|
PREDICTED SYSTEM PERFORMANCE:
|
Annual electricity generated:
|
2,964 kWh
|
|
Annual CO2 emissions saved:
|
1,684 kg
|
|
Download PDF
FREE Site Survey
Contact Ecofirst to arrange a Solar PV or Wood Biomass Site Survey
Newsletter
Sign-up to the Ecofirst newsletter to keep up to date with the latest renewable energy news.