Commercial & public sector

Storage Unit, Trowbridge, Wiltshire
|
PROJECT DETAILS:
- Grid-tied solar photovoltaic (PV) system with Romag modules retro-fitted onto a corrugated sheet roof.
- Installing three inverters kept output current below 16A per phase and ensured compliance with G83/1 regs.
|
|
SYSTEM SIZE:
11.9 kWp (66 x 180W modules)
|
INSTALLATION DATE:
January 2010
|
|
TECHNICAL SPECIFICATION
|
PV Modules:
|
Romag SMT6(48)P (polycrystalline)
|
|
Mounting System:
|
Schüco PV Light
|
|
DC/AC Inverter:
|
SMA SB3800 (x3)
|
|
PREDICTED SYSTEM PERFORMANCE:
|
Annual electricity generated:
|
9,475 kWh
|
|
Annual CO2 emissions saved:
|
5,382 Kg
|
|
Download PDF
FREE Site Survey
Contact Ecofirst to arrange a Solar PV or Wood Biomass Site Survey
Newsletter
Sign-up to the Ecofirst newsletter to keep up to date with the latest renewable energy news.